Performance parameter selection table
Model (SCRUBBER-XGH)
|
Airflow?M3/H)
|
Auxiliary fan
|
Matching water pump
|
Outline dimension
|
Model ?Fan-Sys)
|
Power Hp/kw
|
Static pressure mmAq/Pa
|
Model?KD?
|
Lift(m)
|
Power Hp/kw
|
Diameter mm
|
Height mm
|
Air inlet LxW
|
Air outletΦmm
|
1200
|
6000-9000
|
XGH-030
|
7.5/5.5
|
140/1400
|
50vk-35
|
12
|
3/2.2
|
1200
|
4200
|
450*300
|
450
|
1500
|
10000-13000
|
XGH-040
|
10/7.5
|
140/1400
|
50vk-55
|
14
|
5/4
|
1500
|
4200
|
550*360
|
550
|
1800
|
14000-16000
|
XGH-045
|
15/11
|
120/1200
|
50vk-55
|
14
|
5/4
|
1800
|
4200
|
650*420
|
650
|
2000
|
17000-20000
|
XGH-050
|
20/15
|
150/1500
|
65vk-55
|
14
|
5/4
|
2000
|
4600
|
750*500
|
750
|
2200
|
21000-25000
|
XGH-055
|
25/18.5
|
165/1650
|
65vk-55
|
14
|
5/4
|
2200
|
4600
|
850*550
|
850
|
2500
|
26000-32000
|
XGH-060
|
30/22
|
160/1600
|
65vk-7.55
|
16
|
7.5/5.5
|
2500
|
4600
|
880*600
|
900
|
2800
|
33000-37000
|
XGH-070
|
40/30
|
160/1600
|
65vk-7.55
|
16
|
7.5/5.5
|
2800
|
4600
|
900*650
|
950
|
3000
|
38000-42000
|
XGH-070
|
50/37.5
|
150/1600
|
65vk-7.55
|
16
|
7.5/5.5
|
3000
|
4800
|
950*680
|
1000
|
3200
|
43000-50000
|
XGH-080
|
50/37.5
|
175/1750
|
65vk-105
|
18
|
10/7.5
|
3200
|
4800
|
1050*800
|
1150
|
3500
|
51000-62000
|
XGH-080
|
60/45
|
150/1500
|
65vk-105
|
18
|
10/7.5
|
3500
|
4800
|
1080*840
|
1200
|
Instructions for use
1. In the use of the device before the first inspection of the various components such as pumps, fans are operating normally, the valve open absorption liquid circulation pipeline to maintain flow.
2. Allocation and liquid drugs must be filtered into the solution tank, avoid water inlet filter cover because the magazine is blocked by a predetermined amount. Neutralizing drugs manual and automatic join, the drug should be according to the concentration of waste, waste gas quantity to adjust the concentration and the addition of velocity.
3. To supplement the water valve of the switch to strengthen management, so that the liquid level in the tank before the start of the pump to reach the height of the overflow port to ensure the normal start of the circulating water pump, but also to prevent the loss of control of the loss caused by loss of water.
4. The circulating water pipe through a bypass valve control loop tube pressure gauge is generally maintained at 1-1.5kg/cm2.
5. Regularly check the concentration of absorption solution, two sodium oxide (NAOH) concentration in 3-6%, sodium sulfide (Na2S) concentration of 2-3%.
6. Each one to February, clean the tank once again, to re configure the new absorbent.
7. Purification tower tank circulating water on a regular basis to replace, generally in 15-30 days, the frequency of replacement of circulating water (cycle), should be adjusted according to the nature of the waste.
8. Weekly check a fan bearing seat level, below the oil standard 50% should be added. Weekly check a fan fastener, fan is in the 24 hours of high speed continuous operation of the machine, the fastener even locking, to improve the service life of the ventilation system is very important. The fan belt in the three months after the operation should be adjusted once, after every six months for an adjustment.
9. Fan FRP and pump switch program?Boot time?First open the fan, after the opening of the pump
Off time?First off the pump, after the clearance of the wind turbine