中文版  |   English  |  ไทย        

 Products
 PP Scrubber & FRP Scrubber Equipment
 Pump
 Dust Collector Equipment
 Stainless Steel Products
 PP material products & UPVC
 PVC products
 Production Equipment
 Filter
  PP PVC UPVC Piping Work
 Galvanized Pipe
 Blower
 Copper
วันนี้ 3
เมื่อวาน 19
สัปดาห์นี้ 132
สัปดาห์ก่อน 120
เดือนนี้ 522
เดือนก่อน 1,114
ทั้งหมด 259,537
  Your IP :3.144.97.189
Waste disposal system Table of Vertical FRP Washing Tower
จำนวน
ชิ้น
Share on Facebook
 

Performance parameter selection table

Model (SCRUBBER-XGH)

Airflow?M3/H)

Auxiliary fan

Matching water pump

Outline dimension

Model       ?Fan-Sys)

Power Hp/kw

Static pressure mmAq/Pa

Model?KD?

Lift(m)

Power Hp/kw

Diameter mm

Height mm

Air inlet LxW

Air outletΦmm

1200

6000-9000

XGH-030

7.5/5.5

140/1400

50vk-35

12

3/2.2

1200

4200

450*300

450

1500

10000-13000

XGH-040

10/7.5

140/1400

50vk-55

14

5/4

1500

4200

550*360

550

1800

14000-16000

XGH-045

15/11

120/1200

50vk-55

14

5/4

1800

4200

650*420

650

2000

17000-20000

XGH-050

20/15

150/1500

65vk-55

14

5/4

2000

4600

750*500

750

2200

21000-25000

XGH-055

25/18.5

165/1650

65vk-55

14

5/4

2200

4600

850*550

850

2500

26000-32000

XGH-060

30/22

160/1600

65vk-7.55

16

7.5/5.5

2500

4600

880*600

900

2800

33000-37000

XGH-070

40/30

160/1600

65vk-7.55

16

7.5/5.5

2800

4600

900*650

950

3000

38000-42000

XGH-070

50/37.5

150/1600

65vk-7.55

16

7.5/5.5

3000

4800

950*680

1000

3200

43000-50000

XGH-080

50/37.5

175/1750

65vk-105

18

10/7.5

3200

4800

1050*800

1150

3500

51000-62000

XGH-080

60/45

150/1500

65vk-105

18

10/7.5

3500

4800

1080*840

1200

 

Instructions for use

1. In the use of the device before the first inspection of the various components such as pumps, fans are operating normally, the valve open absorption liquid circulation pipeline to maintain flow.

2. Allocation and liquid drugs must be filtered into the solution tank, avoid water inlet filter cover because the magazine is blocked by a predetermined amount. Neutralizing drugs manual and automatic join, the drug should be according to the concentration of waste, waste gas quantity to adjust the concentration and the addition of velocity.

3. To supplement the water valve of the switch to strengthen management, so that the liquid level in the tank before the start of the pump to reach the height of the overflow port to ensure the normal start of the circulating water pump, but also to prevent the loss of control of the loss caused by loss of water.

4. The circulating water pipe through a bypass valve control loop tube pressure gauge is generally maintained at 1-1.5kg/cm2.

5. Regularly check the concentration of absorption solution, two sodium oxide (NAOH) concentration in 3-6%, sodium sulfide (Na2S) concentration of 2-3%.

6. Each one to February, clean the tank once again, to re configure the new absorbent.

7. Purification tower tank circulating water on a regular basis to replace, generally in 15-30 days, the frequency of replacement of circulating water (cycle), should be adjusted according to the nature of the waste.

8. Weekly check a fan bearing seat level, below the oil standard 50% should be added. Weekly check a fan fastener, fan is in the 24 hours of high speed continuous operation of the machine, the fastener even locking, to improve the service life of the ventilation system is very important. The fan belt in the three months after the operation should be adjusted once, after every six months for an adjustment.

9. Fan FRP and pump switch program?Boot time?First open the fan, after the opening of the pump

  Off time?First off the pump, after the clearance of the wind turbine

 

 

 
 
 
 
Copyright © 2013-2015 Thai Xin All Rights Reserved. 
Powered by  ThaiWebPlus 
Scrubber system, Environmental Protection, Air Pollution Control, Air treatment system,Ventilation systems,aroma therapy